Win on speed. Protect quality.

Tark Platform collects production data automatically and connects planning, work, quality control and reports

Tark machine Gantt view
Tark sales dashboard
Tark OEE dashboard
Also on phone
Tark scheduling on phone

Modular decision making and control system for manufacturing

Main Problem

We lose competitiveness when...

Production slows

Lost time often stays invisible. Only long stoppages get reported, the next step is hard to plan ahead, and people end up waiting because the real status is not visible in one place.

  • Only long stoppages get reported
  • The next step is hard to plan ahead
  • Calls replace shared visibility

Quality slips

When issues are found too late, scrap, rework, and customer risk rise together. Root cause analysis becomes detective work.

  • Checks happen too late
  • Traceability is incomplete
  • It takes days to know why

Decisions stall

Excel is great for one-off analysis. When the work repeats, the hidden tax kicks in: doubts about freshness, copy-paste errors, and decisions that drag because the info is not there yet.

  • 20 minutes here, 20 minutes there
  • "Is this the latest file?"
  • Decisions stall

Slow factories are rarely missing effort. They are missing timely visibility, early warnings when something needs attention, and a clear way to turn insights into real change on the floor.

6 Quick Demos

Run production from one place — Tark Platform

Know what is coming before it hits the floor.

The funnel makes demand visible early enough to prepare capacity, dates, and risk instead of surprising production at the last minute.

  • See pipeline value and likely close dates
  • Pass cleaner order data into production
  • Reduce promise-date surprises
Tark sales dashboard

Planning makes load and sequence visible at a glance.

See the week, move work into place, and expose overload before it becomes waiting, rework, or missed handovers.

  • Weekly board with real work in view
  • Teams and lines visible together
  • Fast rescheduling when priorities change
Tark order Gantt planning board

Operator guidance stays in one view.

Instead of paper and memory, the task shows pace, tolerances, and confirmations on the screen while the job is still running.

  • Live gauges for pace and tolerances
  • Operator checks with clear confirmation
  • Proof of completion stays with the order
Tark operator view

Reliable information reaches both the floor and the office in time.

Tark Platform takes in data directly from the machine, sensor, and people. You can see it 15 minutes later both on the floor and in the office. That gives teams enough trustworthy context to react while the situation is still unfolding.

  • Collect data from machines, sensors, and people
  • Show the same context in dashboards, charts, and reports
  • Give teams enough trusted information to act in time
Tark channel monitor

Review turns speed, cost, and quality into one conversation.

OEE metrics make losses visible and keep improvement tied to facts, not to whoever speaks loudest in the room.

  • Big numbers for OEE, good output, and scrap
  • Availability, performance, and quality in one view
  • Pareto of losses for the next improvement step
Tark OEE review

Lead production and raise competitiveness.

The KPI dashboard brings speed, cost, and quality into the same conversation and ties them to financials, customers, processes, and growth.

  • Track key metrics: speed, cost, quality
  • Full picture across financials, customers, processes, and growth
  • Deviations surface before they become costs
Tark KPI dashboard

Define once

Product data, sizing, special requirements, and quality expectations are set once, not retyped at every next step.

Integrate, not copy

Information moves from sales into project management, production, and quality without manual copy-paste.

Trust the information

Every role works from the same up-to-date view instead of an old printout, old file, or outdated instruction.

When a new version, special sizing, or quality requirement is defined in one place, the floor does not end up working from an old document or missed detail.

Results

Shared understanding on the floor and in the office.

10x faster information flow

Less status chasing, less waiting, and fewer handoff delays between roles.

-60% avoidable mistakes

Earlier checks and better traceability reduce errors before they become expensive.

A working routine in 2 weeks

The goal is not a presentation. The goal is a working management rhythm the team actually uses.

IAC Estagar Raitwood

"... their work does not include nice-to-have development. It focuses on solutions that bring real value to the company."

Marek Hirs, Production Manager at Rait AS

Speed and quality improve when production and management look at the same picture and review it in the same rhythm, not from different files at different times.

How we start

  • 1
    Set the target

    We agree whether the first win should come from speed, cost, or quality.

  • 2
    Get the first view into daily use

    We configure the first operating flow and management view so the current state becomes trustworthy.

  • 3
    Build a management rhythm

    We tie the view into a daily or weekly management rhythm so the improvement sticks.

We will set it up manually and respond within 24 hours.

Background